Please expect construction at the City Cemetery through May 1. We will be installing a buried draining system to allow stormwater to be absorbed and filtered in the ground along 400 South. In addition, a "loop road" attached to 100 North Cemetery Street will be installed, allowing more direct access to the cemetery blocks at the far north/east corner of the cemetery. Everything should be looking great before Mother's Day and Memorial Day. Our cemetery staff will ensure uninterrupted service to cemetery patrons during this time.